User Settings
Open AccessArticle10.3133/ofr54198

Geologic and seismic investigation for relocation of Route 138, Brockton-Avon town line, prospective cut, stations 193+00 in Brockton to 8+00 in Avon, Mass.

James E. May,Raymond Miller-1954-01-01-Antarctica A Keystone in a Changing World

TL;DRAbstract

This work was done to obtain information that would aid in establishing a grade for this segment of Route 138, and would also be of value in determining the kinds and quantities of materials to be excavated from the prospective cut at this site. The work was performed in August 1952 as part of a cooperative program of the Massachusetts Department of Public Works and the United States Geological Survey.

Chat with Paper

AI Agents for this Paper

This work was done to obtain information that would aid in establishing a grade for this segment of Route 138, and would also be of value in determining the kinds and quantities of materials to be excavated from the prospective cut at this site. The work was performed in August 1952 as part of a cooperative program of the Massachusetts Department of Public Works and the United States Geological Survey.

Keywords

RelocationWork (physics)Line (geometry)GeologyGeological surveyArchaeologyMining engineeringEngineering

Chat

Click to start Chat