Article10.1016/0148-9062(90)94617-3
Simultaneous drilling and underreaming saves rig time
-1990-06-01-International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts
2
Chat with Paper
AI Agents for this Paper
No abstract available for this paper.
Keywords
Drilling rigDrillingPetroleum engineeringGeologyMarine engineeringMining engineeringEngineeringMechanical engineering
Chat
Click to start Chat