Automation impact study of Army Training Management
TL;DRAbstract
The main objectives of this impact study were to identify the potential cost savings associated with automated Army Training Management (TM), and to perform a cost-benefit analysis for an Army-wide automated TM system. A subsidiary goal was to establish baseline data for an independent evaluation of a prototype Integrated Training Management System (ITMS), to be tested in the fall of 1988. A structured analysis of TM doctrine was performed for comparison with empirical data gathered in a job analysis survey of selected units of the 9ID (MTZ) at Ft. Lewis, Washington. These observations will be extended to other units in subsequent surveys. The survey data concerning staffing levels and amount of labor expended on eight distinct TM tasks were analyzed in a cost effectiveness model. The main results of the surveys and cost effectiveness modelling are summarized. 18 figs., 47 tabs.
Chat with Paper
AI Agents for this Paper
The main objectives of this impact study were to identify the potential cost savings associated with automated Army Training Management (TM), and to perform a cost-benefit analysis for an Army-wide automated TM system. A subsidiary goal was to establish baseline data for an independent evaluation of a prototype Integrated Training Management System (ITMS), to be tested in the fall of 1988. A structured analysis of TM doctrine was performed for comparison with empirical data gathered in a job analysis survey of selected units of the 9ID (MTZ) at Ft. Lewis, Washington. These observations will be extended to other units in subsequent surveys. The survey data concerning staffing levels and amount of labor expended on eight distinct TM tasks were analyzed in a cost effectiveness model. The main results of the surveys and cost effectiveness modelling are summarized. 18 figs., 47 tabs.
Keywords
Chat
Click to start Chat