User Settings

Worker Hazard Management of Building Demotition

Shu‐Chuan Chang,Yi-Chih Chen,Kuan‐Yung Chang,Walter Chen-2000-09-20-Proceedings of the ... ISARC
0

TL;DRAbstract

Worker Hazard Management of Building Demotition Shu-Chuan Chang, Yi-Chih Chen, Kuan-Yung Chang, Walter Chen Pages 1-5 (2000 Proceedings of the 17th ISARC, Taipei, Taiwan, ISBN 9789570266986) Abstract: The Ji-Ji earthquake was the most damaging earthquake that Taiwan has ever suffered over the past century. In addition to mountain collapses, landslides, fault slippage, bridge ruptures, and roadway buckling, tens of thousands of buildings were also crushed by the powerful force of the earthquake. In the Ji-Ji earthquake, the most serious damaged infrastructures were building structures. Generally speaking, there were four major reasons that contributed to the damages of the large number of buildings--the strong intensity of the earthquake, the poor architectural design of the buildings, the poor structural design of the buildings, and the poor quality control during the buildings? constructions. After the earthquake, due to the urgent needs to rescue survivors, there was not enough time

Chat with Paper

AI Agents for this Paper

Worker Hazard Management of Building Demotition Shu-Chuan Chang, Yi-Chih Chen, Kuan-Yung Chang, Walter Chen Pages 1-5 (2000 Proceedings of the 17th ISARC, Taipei, Taiwan, ISBN 9789570266986) Abstract: The Ji-Ji earthquake was the most damaging earthquake that Taiwan has ever suffered over the past century. In addition to mountain collapses, landslides, fault slippage, bridge ruptures, and roadway buckling, tens of thousands of buildings were also crushed by the powerful force of the earthquake. In the Ji-Ji earthquake, the most serious damaged infrastructures were building structures. Generally speaking, there were four major reasons that contributed to the damages of the large number of buildings--the strong intensity of the earthquake, the poor architectural design of the buildings, the poor structural design of the buildings, and the poor quality control during the buildings? constructions. After the earthquake, due to the urgent needs to rescue survivors, there was not enough time

Keywords

DemolitionDamagesHazardForensic engineeringEmergency managementBridge (graph theory)Disaster areaSeismic hazard

Chat

Click to start Chat