Enhancement of ASPEN's (Advanced System for Process ENgineering) equipment cost estimation system

Philip J. Johnson,M.L. Myers,J.M. Begovich-1988-04-01-OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
0

TL;DRAbstract

Nine new captial equipment costing models have been developed for the VAX 11/780 version of ASPEN (Advanced System for Process ENgineering). The new equipment cost models and three existing ASPEN models which are revised, reflect equipment items typically found in large scale synthetic fuel plants. Included in this report are the new ASPEN User and Technical Reference Manual sections (Appendixes A and B), the FORTMAN subroutines, the code required to revise the ASPEN program (Appendixes D and E), and results from each of the new and revised cost models (in tables in the body of the report).

Chat with Paper

AI Agents for this Paper

Nine new captial equipment costing models have been developed for the VAX 11/780 version of ASPEN (Advanced System for Process ENgineering). The new equipment cost models and three existing ASPEN models which are revised, reflect equipment items typically found in large scale synthetic fuel plants. Included in this report are the new ASPEN User and Technical Reference Manual sections (Appendixes A and B), the FORTMAN subroutines, the code required to revise the ASPEN program (Appendixes D and E), and results from each of the new and revised cost models (in tables in the body of the report).

Keywords

Activity-based costingSubroutineProcess (computing)Cost estimateComputer scienceScale (ratio)Reliability engineeringEngineering drawing