OPTIMASI PENGGALIAN PADA KAPAL KERUK SENGKEP 1DENGAN MENINGKATKAN LAJU PEMINDAHAN TANAHPADA PENAMBANGAN TIMAH ALLUVIAL LEPAS PANTAIDI LAUT PERMIS KEPULAUAN BANGKA

0

TL;DRAbstract

ABSTRACT At this time PT.Timah Tbk. mining in the area Permis Sea using Dredges Singkep 1 which has the capacity to bowl 24 CUFT (0.68 m3), with the location of astronomical 2o57'00 - 3o00'20 LS and 105o56'00 - 106o03'50 BT. The rate of soil excavation (LPT) on the dredger Singkep 1 850 m3/hr targeted for topsoil and 350 m3/hr for leaded sand layer. Excavation systems used Dredges Singkep 1 currently is the system press perlapisan ground while extracting method is applied shortface method. This method is done by dividing the work into the vault slices with a slice width of 30 meters from 90 meters under the work that is intended to perform a selective excavation. Based on field observations and calculations made from data that has been collected, the rate of transfer of land is currently at 833.33 m3/hr for topsoil and 364.96 m3/hr for leaded sand layer. It shows the rate of transfer of land specifically for the topsoil has not been achieved from targeted. The factors th

Chat with Paper

AI Agents for this Paper

ABSTRACT At this time PT.Timah Tbk. mining in the area Permis Sea using Dredges Singkep 1 which has the capacity to bowl 24 CUFT (0.68 m3), with the location of astronomical 2o57'00 - 3o00'20 LS and 105o56'00 - 106o03'50 BT. The rate of soil excavation (LPT) on the dredger Singkep 1 850 m3/hr targeted for topsoil and 350 m3/hr for leaded sand layer. Excavation systems used Dredges Singkep 1 currently is the system press perlapisan ground while extracting method is applied shortface method. This method is done by dividing the work into the vault slices with a slice width of 30 meters from 90 meters under the work that is intended to perform a selective excavation. Based on field observations and calculations made from data that has been collected, the rate of transfer of land is currently at 833.33 m3/hr for topsoil and 364.96 m3/hr for leaded sand layer. It shows the rate of transfer of land specifically for the topsoil has not been achieved from targeted. The factors th

Keywords

ExcavationTopsoilMining engineeringGeotechnical engineeringGeologyEngineeringEnvironmental scienceSoil water

Chat

Click to start Chat