Preliminary Analysis and Case Study of Transmission Constraints and Wind Energy in the West: Preprint

M. Milligan-2005-05-01-University of North Texas Digital Library (University of North Texas)

TL;DRAbstract

Wind developers typically need long-term transmission service to finance their projects; however, most of the capacity on several key paths is reserved by existing firm contracts. Because non-firm contracts are only offered for periods up to 1 year, obtaining financing for the wind project is generally not possible when firm capacity is unavailable. However, sufficient capacity may exist on the constrained paths for new wind projects that can risk curtailment for a small number of hours of the year. This paper presents the results of a study sponsored by the National Renewable Energy Laboratory (NREL), a work group participant in the Rocky Mountain Area Transmission Study (RMATS). Using recent historical power flow data, case studies were conducted on the constrained paths between Wyoming-Colorado (TOT3) and Montana-Northwest, coinciding with areas of exceptional wind resources. The potential curtailment frequency for hypothetical 100-MW and 500-MW wind plants was calculated using hour

Chat with Paper

AI Agents for this Paper

Wind developers typically need long-term transmission service to finance their projects; however, most of the capacity on several key paths is reserved by existing firm contracts. Because non-firm contracts are only offered for periods up to 1 year, obtaining financing for the wind project is generally not possible when firm capacity is unavailable. However, sufficient capacity may exist on the constrained paths for new wind projects that can risk curtailment for a small number of hours of the year. This paper presents the results of a study sponsored by the National Renewable Energy Laboratory (NREL), a work group participant in the Rocky Mountain Area Transmission Study (RMATS). Using recent historical power flow data, case studies were conducted on the constrained paths between Wyoming-Colorado (TOT3) and Montana-Northwest, coinciding with areas of exceptional wind resources. The potential curtailment frequency for hypothetical 100-MW and 500-MW wind plants was calculated using hour

Keywords

PreprintTransmission (telecommunications)Wind powerEnergy (signal processing)Computer scienceElectrical engineeringEngineeringTelecommunications

Chat

Click to start Chat