Ground water activation calculations for E872
TL;DRAbstract
The E872 beam dump geometry has been modeled in CASIM and calculations have been done to determine the annual limits for protons n target. Results are presented using both the single resident well model (SRWM) and the newly-approved concentration model (CM). The conclusion is that the target/dump design is adequate for the maximum number of protons on target requested by the experiment, which is >1 {times} 10{sup 18} protons per year at 800 GeV.
Chat with Paper
AI Agents for this Paper
The E872 beam dump geometry has been modeled in CASIM and calculations have been done to determine the annual limits for protons n target. Results are presented using both the single resident well model (SRWM) and the newly-approved concentration model (CM). The conclusion is that the target/dump design is adequate for the maximum number of protons on target requested by the experiment, which is >1 {times} 10{sup 18} protons per year at 800 GeV.