CitedEvidence
User Settings
Open AccessReport10.2172/100256

Ground water activation calculations for E872

0

TL;DRAbstract

The E872 beam dump geometry has been modeled in CASIM and calculations have been done to determine the annual limits for protons n target. Results are presented using both the single resident well model (SRWM) and the newly-approved concentration model (CM). The conclusion is that the target/dump design is adequate for the maximum number of protons on target requested by the experiment, which is >1 {times} 10{sup 18} protons per year at 800 GeV.

Chat with Paper

AI Agents for this Paper

The E872 beam dump geometry has been modeled in CASIM and calculations have been done to determine the annual limits for protons n target. Results are presented using both the single resident well model (SRWM) and the newly-approved concentration model (CM). The conclusion is that the target/dump design is adequate for the maximum number of protons on target requested by the experiment, which is >1 {times} 10{sup 18} protons per year at 800 GeV.

Keywords

Beam (structure)PhysicsNuclear physicsEnvironmental scienceComputational physicsAtomic physicsOptics

Chat

Click to start Chat