CitedEvidence
User Settings
Open AccessReport10.2172/4689504

PERFORMANCE OF A BANK OF FOUR 7 FT. STREAMER CHAMBERS. Technical Report No. 72-032.

0

TL;DRAbstract

Design, Conceptual Test and Operating Plans, Development Plans, Procurement and Management Plans for Subsequent Phases, and Cost Estimates. The Solar Total Energy system is sized to supply 1.720 MW thermal power and 383.6 KW electrical power. The STES is sized for the extended knitwear plant of 3902 M/sup 2/ (42,000 sq-ft) which will eventually employ 300 people. Drawings, tables, and data sheets are included on hourly temperatures, displacement, utility rates, power conversion system, seasonal design load summary, average collector temperature optimization study, system operating temperature optimization study, power conversion system seasonal performance, thermal storage/fluid loop, system integration, and cost estimates. (WHK)

Chat with Paper

AI Agents for this Paper

Design, Conceptual Test and Operating Plans, Development Plans, Procurement and Management Plans for Subsequent Phases, and Cost Estimates. The Solar Total Energy system is sized to supply 1.720 MW thermal power and 383.6 KW electrical power. The STES is sized for the extended knitwear plant of 3902 M/sup 2/ (42,000 sq-ft) which will eventually employ 300 people. Drawings, tables, and data sheets are included on hourly temperatures, displacement, utility rates, power conversion system, seasonal design load summary, average collector temperature optimization study, system operating temperature optimization study, power conversion system seasonal performance, thermal storage/fluid loop, system integration, and cost estimates. (WHK)

Keywords

ProcurementPower (physics)Environmental scienceElectric power systemThermalNuclear engineeringElectrical engineeringComputer science

Chat

Click to start Chat