CitedEvidence
User Settings

Optimal Dynamic Application of a Fraction-Defective Control Chart to Control a Production Process

5

TL;DRAbstract

When a manufacturing process is controlled with a Fraction-Defective Control-Chart, the values of 3 decision variables have to be determined: the timing of the samples, the size of the samples, and the distance of the control limits from the central line on the control-chart in terms of standard deviations.

Chat with Paper

AI Agents for this Paper

When a manufacturing process is controlled with a Fraction-Defective Control-Chart, the values of 3 decision variables have to be determined: the timing of the samples, the size of the samples, and the distance of the control limits from the central line on the control-chart in terms of standard deviations.

Keywords

Control chartControl limitsChartFraction (chemistry)Shewhart individuals control chartProcess (computing)X-bar chart\bar x and R chart

Chat

Click to start Chat