CitedEvidence
User Settings

WE‐G‐BRA‐02: SafetyNet: Automating Radiotherapy QA with An Event Driven Framework

0

TL;DRAbstract

Purpose: Quality assurance is an essential task in radiotherapy that often requires many manual tasks. We investigate the use of an event driven framework in conjunction with software agents to automate QA and eliminate wait times. Methods: An in house developed subscription‐publication service, EventNet, was added to the Aria OIS to be a message broker for critical events occurring in the OIS and software agents. Software agents operate without user intervention and perform critical QA steps. The results of the QA are documented and the resulting event is generated and passed back to EventNet. Users can subscribe to those events and receive messages based on custom filters designed to send passing or failing results to physicists or dosimetrists. Agents were developed to expedite the following QA tasks: Plan Revision, Plan 2nd Check, SRS Winston‐Lutz isocenter, Treatment History Audit, Treatment Machine Configuration. Results: Plan approval in the Aria OIS was used as the event trigge

Chat with Paper

AI Agents for this Paper

Purpose: Quality assurance is an essential task in radiotherapy that often requires many manual tasks. We investigate the use of an event driven framework in conjunction with software agents to automate QA and eliminate wait times. Methods: An in house developed subscription‐publication service, EventNet, was added to the Aria OIS to be a message broker for critical events occurring in the OIS and software agents. Software agents operate without user intervention and perform critical QA steps. The results of the QA are documented and the resulting event is generated and passed back to EventNet. Users can subscribe to those events and receive messages based on custom filters designed to send passing or failing results to physicists or dosimetrists. Agents were developed to expedite the following QA tasks: Plan Revision, Plan 2nd Check, SRS Winston‐Lutz isocenter, Treatment History Audit, Treatment Machine Configuration. Results: Plan approval in the Aria OIS was used as the event trigge

Keywords

Computer scienceEvent (particle physics)Quality assuranceSoftwareIsocenterPlan (archaeology)Task (project management)Process (computing)

Chat

Click to start Chat