Evaluation of the 296-C-006 HVAC system for tank 241-C-106

0

TL;DRAbstract

Prior to the sluicing of Tank 241-C-106, the 296-P-16 ventilation system will be shutdown and the 296-C-006 ventilation system operation will be initiated. The 296-C-006 system has a low once through flow with an additional recirculation flow in the tank dome space. A minimum dome pressure of -3 in W.G. is necessary for safe operation. An evaluation of the system has been performed. The results of the study show that adequate dome space vacuum can be achieved if the pump pits in Tank 241-C-106 are sealed.

Chat with Paper

AI Agents for this Paper

Prior to the sluicing of Tank 241-C-106, the 296-P-16 ventilation system will be shutdown and the 296-C-006 ventilation system operation will be initiated. The 296-C-006 system has a low once through flow with an additional recirculation flow in the tank dome space. A minimum dome pressure of -3 in W.G. is necessary for safe operation. An evaluation of the system has been performed. The results of the study show that adequate dome space vacuum can be achieved if the pump pits in Tank 241-C-106 are sealed.

Keywords

HVACEnvironmental scienceComputer scienceEngineeringMechanical engineeringAir conditioning

Chat

Click to start Chat