TL;DRAbstract

Adopting the BOT (build-operate-transfer) delivery method has brought opportunities and challenges in construction time and quality for urban infrastructure. Many studies investigate the upstream issues of BOT projects such as concessionaire selection criteria and risk factors. But the project execution becomes complicated such as the escalated quality supervision organization and procedure at the construction stage. This extra supervision may have constituted hidden redundancies as waste to economic sustainability. This paper investigated construction quality supervision of BOT projects to pinpoint adequate degree of supervision and detect redundant organization and procedures. The study adopted ten subway construction projects as cases in which five were from the traditional design-bid-build (DBB) and five from the BOT methods. Thirty six project participants including owners, contractors, designers, and concessionaire managers of the ten projects were interviewed to tell their views

Chat with Paper

AI Agents for this Paper

Adopting the BOT (build-operate-transfer) delivery method has brought opportunities and challenges in construction time and quality for urban infrastructure. Many studies investigate the upstream issues of BOT projects such as concessionaire selection criteria and risk factors. But the project execution becomes complicated such as the escalated quality supervision organization and procedure at the construction stage. This extra supervision may have constituted hidden redundancies as waste to economic sustainability. This paper investigated construction quality supervision of BOT projects to pinpoint adequate degree of supervision and detect redundant organization and procedures. The study adopted ten subway construction projects as cases in which five were from the traditional design-bid-build (DBB) and five from the BOT methods. Thirty six project participants including owners, contractors, designers, and concessionaire managers of the ten projects were interviewed to tell their views

Keywords

Quality (philosophy)Construction engineeringEngineeringProcess managementEngineering managementBusinessComputer scienceSystems engineering