CitedEvidence
User Settings
Other

Supplier segmentation and development in project business

Linda Savolainen-2014-12-30-Doria (University of Helsinki)
0

TL;DRAbstract

The purpose of this study was to expand the applicability of supplier segmentation and development approaches to the project-driven construction industry. These practices are less exploited and not well documented in this operational environment compared to the process-centric manufacturing industry. At first, portfolio models to supply base segmentation and various supplier development efforts were investigated in literature review. A step-wise framework was structured for the empirical research. The empirical study employed multiple research methods in three case studies in a large Finnish construction company. The first study categorized the construction item classes into the purchasing portfolio and positioned suppliers to the power matrix by investigating buyer-supplier relations. Using statistical tests, the study also identified factors that affect suppliers’ performance. The final case study identified improvement areas of the interface between a main contractor and one if its

Chat with Paper

AI Agents for this Paper

The purpose of this study was to expand the applicability of supplier segmentation and development approaches to the project-driven construction industry. These practices are less exploited and not well documented in this operational environment compared to the process-centric manufacturing industry. At first, portfolio models to supply base segmentation and various supplier development efforts were investigated in literature review. A step-wise framework was structured for the empirical research. The empirical study employed multiple research methods in three case studies in a large Finnish construction company. The first study categorized the construction item classes into the purchasing portfolio and positioned suppliers to the power matrix by investigating buyer-supplier relations. Using statistical tests, the study also identified factors that affect suppliers’ performance. The final case study identified improvement areas of the interface between a main contractor and one if its

Keywords

Process managementBusinessComputer scienceOperations managementEngineering

Chat

Click to start Chat