Advanced sluicing system test report for single shell tank waste retrieval integrated testing
TL;DRAbstract
This document describes the testing performed by ARD Environmental, Inc., and Los Alamos Technical Associates of the LATA/ARD Advanced Sluicing System, in support of ACTR Phase 1 activities. Testing was to measure the impact force and pressures of sluicing streams at three different distances, as measured by the Government supplied load cell. Simulated sluicing of large simulated salt cake and hard pan waste coupons was also performed. Due to operational difficulties experienced with the Government supplied load cell, no meaningful results with respect to sluice stream impact pressure distribution or stream coherence were obtained. Sluice testing using 3000 psi salt cake simulants measured waste retrieval rates of approximately 12 Ml/day (17.6 ft{sup 3}/hr). Rates as high as 314 m{sup 3}/day (463 ft{sup 3}/hr) were measured against the lower strength salt cake simulants.
Chat with Paper
AI Agents for this Paper
This document describes the testing performed by ARD Environmental, Inc., and Los Alamos Technical Associates of the LATA/ARD Advanced Sluicing System, in support of ACTR Phase 1 activities. Testing was to measure the impact force and pressures of sluicing streams at three different distances, as measured by the Government supplied load cell. Simulated sluicing of large simulated salt cake and hard pan waste coupons was also performed. Due to operational difficulties experienced with the Government supplied load cell, no meaningful results with respect to sluice stream impact pressure distribution or stream coherence were obtained. Sluice testing using 3000 psi salt cake simulants measured waste retrieval rates of approximately 12 Ml/day (17.6 ft{sup 3}/hr). Rates as high as 314 m{sup 3}/day (463 ft{sup 3}/hr) were measured against the lower strength salt cake simulants.
Keywords
Chat
Click to start Chat