A feasibility study on constructing a flood diversion channel: Exploring the possibilities of constructing a flood diversion channel between the Mekong River and the Gulf of Thailand as measure to reduce flood risks

C.H. Lin-2013-07-12-Research Repository (Delft University of Technology)

TL;DRAbstract

The yearly floods of the Mekong Delta caused by the Mekong River have been considered a blessing; it purifies the agricultural lands and deposits a fresh layer of silt on the surface, which keeps the delta fertile. However, the growing demand for agricultural products internationally and nationally has pushed the farmers to harvest all year long, which has lead to a situation where the floods are more of a curse than a blessing. Besides the growing agricultural demand, the continuous urbanization has also caused the yearly flood to become less accepted. Furthermore, it is expected that the flooding problems will only increase even more in future due to climate change. A possible solution to reduce the frequency of flood risks is by constructing a flood diversion channel between the Mekong River and the Gulf of Thailand. The purpose of this flood diversion channel is to reduce the water level of the Mekong River during high water preventing it from flooding. The question is, if a flood

Chat with Paper

AI Agents for this Paper

The yearly floods of the Mekong Delta caused by the Mekong River have been considered a blessing; it purifies the agricultural lands and deposits a fresh layer of silt on the surface, which keeps the delta fertile. However, the growing demand for agricultural products internationally and nationally has pushed the farmers to harvest all year long, which has lead to a situation where the floods are more of a curse than a blessing. Besides the growing agricultural demand, the continuous urbanization has also caused the yearly flood to become less accepted. Furthermore, it is expected that the flooding problems will only increase even more in future due to climate change. A possible solution to reduce the frequency of flood risks is by constructing a flood diversion channel between the Mekong River and the Gulf of Thailand. The purpose of this flood diversion channel is to reduce the water level of the Mekong River during high water preventing it from flooding. The question is, if a flood

Keywords

Flood mythChannel (broadcasting)Flood stageFlooding (psychology)Water resource managementFloodplainEnvironmental scienceHydrology (agriculture)